Recent Projects

Extension of Sofia Metro, II-nd metrodiameter, Section from МS "James Bouchier" -МSII-11 up to МSII-12

Extension of Sofia Metro, II-nd metrodiameter, Section from МS "James Bouchier" -МSII-11 up to МSII-12

Subway line II, section (from the subway station MS II-11, km 10+452) to the subway station MS II-12 with a line point after it (km 11+752) and a part of a transport ramp. The total length of the subway section is 1300.3 m. The tunnel section of 781 m of length from the subway station MS II-11 to the inter-station Ventilation System II 11-12 is to be constructed using NATM (New Austrian Tunnel Method). The remaining part of the route is 
Underground pedestrian walkway connection between MS „Tsarigradsko shose“ and „Obikolna“ Street in Residential Quarter „Druzhba“

Underground pedestrian walkway connection between MS „Tsarigradsko shose“ and „Obikolna“ Street in Residential Quarter „Druzhba“

• Assignor: „METROPOLITAN“ EAD • Contractor: Consortium „UNDRGROUND CONSTRUCTION PARTNERS 2014"– Consortium members: -„STANILOV” LTD – Leading Partner with 67 % participation.   -„VIA CONSTRUCT GROUP” LTD – Partner with 30 % participation. -„SVEKO ENERGOPROEKT” AD – Partner with 3 % participation.

News & Events

„Станилов“ ЕООД отново със златен приз от строителните „Оскари“ за 2016 г.

01.11.2017
Камарата на строителите в България награди най-добрите компании в сектора на традиционния бал по повод Деня на строителя – 26 октомври.

Започна изпълнението на проекта за рехабилитация на ВиК мрежата на община Долна Митрополия

31.07.2017
Зам.-министърът на околната среда и водите Красимир Живков днес направи първа копка на проекта за рехабилитация на ВиК мрежата на община Долна Митрополия. Строителните работи са част от интегрирания воден цикъл на Плевен-Долна Митрополия, финансиран по Оперативна ...