Recent Projects

Underground pedestrian walkway connection between MS „Tsarigradsko shose“ and „Obikolna“ Street in Residential Quarter „Druzhba“

Underground pedestrian walkway connection between MS „Tsarigradsko shose“ and „Obikolna“ Street in Residential Quarter „Druzhba“

• Assignor: „METROPOLITAN“ EAD • Contractor: Consortium „UNDRGROUND CONSTRUCTION PARTNERS 2014"– Consortium members: -„STANILOV” LTD – Leading Partner with 67 % participation.   -„VIA CONSTRUCT GROUP” LTD – Partner with 30 % participation. -„SVEKO ENERGOPROEKT” AD – Partner with 3 % participation.
Rehabilitation and extension of sewerage network and adjacent water supply network of City of Shumen – Stage 2

Rehabilitation and extension of sewerage network and adjacent water supply network of City of Shumen – Stage 2

Subject: Design, rehabilitation, and extension of sewerage network and adjacent water supply network of City of Shumen – Stage 2 and design and construction of two new sewerage pumping stations Assignor: Shumen Municipality Contractor: Consortium „Aqua Build Shumen”, Leading Member „Stanilov” LTD

News & Events

Започна изпълнението на проекта за рехабилитация на ВиК мрежата на община Долна Митрополия

31.07.2017
Зам.-министърът на околната среда и водите Красимир Живков днес направи първа копка на проекта за рехабилитация на ВиК мрежата на община Долна Митрополия. Строителните работи са част от интегрирания воден цикъл на Плевен-Долна Митрополия, финансиран по Оперативна ...

На 21 юли стартира вторият етап от третия лъч на софийското метро

24.07.2017
Със символична „първа копка“ в квартал „Овча купел“ официално започна строителството на третия лъч на метрото в София. На церемонията присъстваха кметът на столицата Йорданка Фандъкова, зам.-председателят на Европейската комисия, отговарящ за работните ...