Recent Projects

Extension of Sofia Metro, II-nd metrodiameter, Section from МS "James Bouchier" -МSII-11 up to МSII-12

Extension of Sofia Metro, II-nd metrodiameter, Section from МS "James Bouchier" -МSII-11 up to МSII-12

Subway line II, section (from the subway station MS II-11, km 10+452) to the subway station MS II-12 with a line point after it (km 11+752) and a part of a transport ramp. The total length of the subway section is 1300.3 m. The tunnel section of 781 m of length from the subway station MS II-11 to the inter-station Ventilation System II 11-12 is to be constructed using NATM (New Austrian Tunnel Method). The remaining part of the route is 
Construction of Luda Yana Dam and Potable Water Treatment Plant

Construction of Luda Yana Dam and Potable Water Treatment Plant

Contractor: Joint Venture „STRABAG – STANILOV” with partners: ”STRABAG” AG, ”STANILOV” EOOD and ”STRABAG” EAD – Bulgaria Employer: Ministry of Regional Development and Public Works Engineer: Consultant- Consulting Engineering Group Ltd. Contract value: 56 270 330 BGN including VAT

News & Events

Обявяваме процедура с публична покана за „Доставка на средства за колективна защита от падащи предмети и от падане от височина“

04.07.2018
В изпълнение на Договор BG05M9OP001 – 1.008-2239-С01 за проект „ Подобряване условията на труд и работата с човешките ресурси в "Станилов" ЕООД“  обявяваме процедура с публична покана с предмет „Доставка на средства за колективна защита от падащи предмети и от ...

Обявяваме процедура с публична покана за „Доставка на средства за колективна защита от падащи предмети и от падане от височина"

03.05.2018
В изпълнение на Договор BG05M9OP001 – 1.008-2239-С01 за проект „ Подобряване условията на труд и работата с човешките ресурси в "Станилов" ЕООД“  обявяваме процедура с публична покана с предмет „Доставка на средства за колективна защита от падащи предмети и от ...