Recent Projects

Rehabilitation and extension of sewerage network and adjacent water supply network of City of Shumen – Stage 2

Rehabilitation and extension of sewerage network and adjacent water supply network of City of Shumen – Stage 2

Subject: Design, rehabilitation, and extension of sewerage network and adjacent water supply network of City of Shumen – Stage 2 and design and construction of two new sewerage pumping stations Assignor: Shumen Municipality Contractor: Consortium „Aqua Build Shumen”, Leading Member „Stanilov” LTD
Underground pedestrian walkway connection between MS „Tsarigradsko shose“ and „Obikolna“ Street in Residential Quarter „Druzhba“

Underground pedestrian walkway connection between MS „Tsarigradsko shose“ and „Obikolna“ Street in Residential Quarter „Druzhba“

• Assignor: „METROPOLITAN“ EAD • Contractor: Consortium „UNDRGROUND CONSTRUCTION PARTNERS 2014"– Consortium members: -„STANILOV” LTD – Leading Partner with 67 % participation.   -„VIA CONSTRUCT GROUP” LTD – Partner with 30 % participation. -„SVEKO ENERGOPROEKT” AD – Partner with 3 % participation.

News & Events

На 21 юли стартира вторият етап от третия лъч на софийското метро

24.07.2017
Със символична „първа копка“ в квартал „Овча купел“ официално започна строителството на третия лъч на метрото в София. На церемонията присъстваха кметът на столицата Йорданка Фандъкова, зам.-председателят на Европейската комисия, отговарящ за работните ...

Обявяваме процедура с публична покана с предмет „Доставка на лични предпазни средства /ЛПС/ и специално работно облекло

20.07.2017
В изпълнение на Договор BG05M9OP001 – 1.008-2239-С01 за проект „ Подобряване условията на труд и работата с човешките ресурси в "Станилов" ЕООД“  обявяваме процедура с публична покана с предмет „Доставка на лични предпазни средства /ЛПС/ и специално работно ...