Water-supplies and sewerage systems
Rehabilitation and extension of sewerage network and adjacent water supply network of City of Shumen – Stage 2
2014 - 2015, Water-supplies and sewerage systems
Subject: Design, rehabilitation, and extension of sewerage network and adjacent water supply network of City of Shumen – Stage 2 and design and construction of two new sewerage pumping stations
Assignor: Shumen Municipality
Contractor: Consortium „Aqua Build Shumen”, Leading Member „Stanilov” LTD
Construction of a shaft-tube well, in the Ada Tepe locality, the town of Krumovgrad, the town of Kardzhali district
2013 - 2014, Water-supplies and sewerage systems
Contracting authority: DUNDEE PRECIOUS METALS, KRUMOVGRAD
Contractor: STANILOV LTD.
Rehabilitation of water-supply network, reconstruction and extension of the town of Vidin sewerage system
2013 - 2015, Water-supplies and sewerage systems
Contract Agreement No. А0-02-15-207/04.11.2013
Contracting authority: VIDIN MUNICIPALITY
Contractor: PANONIA AQUA CONSORTIUM DZZD (Company under the Law on Obligations and Contracts)
Consultant /construction supervision/: PK2000-AQUA DZZD (Company under the Law on Obligations and Contracts)
TRANSEKOPROJECT DZZD is both a designer and a designer supervision body.
Reconstruction of the water-supply network in the village of Petko Slaveykov and the village of Kravenik
2013 - 2015, Water-supplies and sewerage systems
Contracting Authority: SEVLIEVO MUNICIPALITY
Contractor: SELVI 2013 CONSORTIUM, with members STANILOV LTD. and Sunnycom LTD.
Re-costruction and completion of the construction works of the town of Dimitrovgrad sewerage system - right bank
2013 - 2014, Water-supplies and sewerage systems
Contracting Authority: DIMITROVGRAD MUNICIPALITY
Contractor:AQUA MARITSA DZZD (Company under the Law on Obligations and Contracts) with members: STANILOV LTD and TVB LTD
Construction of a sewerage network and a waste water treatment module in the village of Rasovo, Medkovets municipality
2012 - 2013, Water-supplies and sewerage systems
The main works executed are:
1. Construction of a WWTP (waste water treatment plant) – with capacity of up to 2000 equivalent inhabitants. It includes mechanical and biological waste water treatment. It is equipped with a SCADA system.
2. Construction of a sewerage network in the village of Renovo: total length – 23 796 m, diameters from 315 to 1000. The network consists of: Main sewers I, II, III, IV and V of the total length of 7135 m; secondary branches – 89; ...
Rehabilitation of water-supply network and rehabilitation/extension of sewerage network of the town of Gabrovo
2012 - 2015, Water-supplies and sewerage systems
Stage 2, 58111-77-268 integrated project for the water cycle of the town of Gabrovo
Operational programme environment 2007-2013
Contract No. 531 – Integrated Project for the Water Cycle (IPWC) – 12/19.10.2012
Supplying water pipeline in the town of Sungurlare, the villages of Chernitsa, Slavyantsi, Chubra, Mokren,Padarevo and Novo selo
2012 - 2013, Water-supplies and sewerage systems
Contract No. RD-02-29-358 / 17.12.2012
Contractor: STANILOV – EAD Consortium
Consortium members: STANILOV LTD., EAD – Veolia
RECONSTRUCTION AND EXTENSION OF SEWERAGE NETWORK LOCATED ON THE LEFT BANK OF MARITZA RIVER FOR THE TOWN OF DIMITROVGRAD
ASSIGNOR:
MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS,
MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) /
ISPA IMPLEMENTING AGENCY,
DIRECTORATE "EUROPEAN INFRASTRUCTURE PROJECTS"
ISPA MEASURE/2000/BG/16/P/PE/003
Construction of the main sewerage collector I in Stara Zagora, the basin of the river Maritsa
2007 - 2008, Water-supplies and sewerage systems
Construction of the main sewerage collector I in Stara Zagora, the basin of the river Maritsa, Bulgaria. The project is financed by the Preannexation program ISPA; European Investment Bank; and Bulgarian State Budget;
The sewerage collector has a total length of 1464 m. Main equipments: Section with length of 941 m. It is built by two fiber-glass pipes DN 2000 disposed in parallel; Combined Sewerage Spillway; Section with a length of 443 m. It is built by fiber-glass pipes DN 800; street ...