Home / Projects / Hydrotechnical construction / Water-supplies and sewerage systems / Re-costruction and completion of the construction works of the town of Dimitrovgrad sewerage system - right bank

Re-costruction and completion of the construction works of the town of Dimitrovgrad sewerage system - right bank

Contracting Authority: DIMITROVGRAD MUNICIPALITY 

Contractor:AQUA MARITSA DZZD (Company under the Law on Obligations and Contracts) with members: STANILOV LTD and TVB LTD

2013 - 2014

Re-costruction and completion of the construction works of the town of Dimitrovgrad sewerage system - right bank.

The project funding is provided under Operational Programme Environment 2007-2013, co-funded by the European Union, through the Cohesion Fund, procedure reference number BG161PO005/10/1.11/02/16 "Improvement and development of potable and waste water infrastructure in agglomerations above 10 000e.i. (equivalent inhabitants)". The project implementation comprises: rehabilitation of main sewers of 3266m of length and secondary sewerage system of 66m of length. The project also comprises: escape canals of 887m of length; new overflow drain 1, 3 and 6. The passing under the railway has been performed without excavation, by means of horizontal drilling and installation of two parallel steel casing pipes DN 1420/16mm - L=134.00m. Ten new shafts have been built after an individual design realization and there has been a water discharge lead away of an escape canal completed after overflow drains 1 and 6, as well as a rehabilitation of a secondary water-supply system network of the total length of 1917m.