Home / Projects / Hydrotechnical construction / Water-supplies and sewerage systems / Rehabilitation of water-supply network and rehabilitation/extension of sewerage network of the town of Gabrovo

Rehabilitation of water-supply network and rehabilitation/extension of sewerage network of the town of Gabrovo

Stage 2, 58111-77-268 integrated project for the water cycle of the town of Gabrovo 

Operational programme environment 2007-2013

Contract No. 531 – Integrated Project for the Water Cycle (IPWC) – 12/19.10.2012

2012 - 2015

The site has been conditionally divided into five sub-sites, as follows:
Sub-site 1. Rehabilitation of the water-supply network of the Central Part of the town: delivery and installation of pressure regulators in newly built shafts, buildings’ branches. The total length of the water-supply network in Sub-site 1, including the buildings’ water pipeline branches, is 16 305 m.
Sub-site 2. Rehabilitation of the water-supply system of Lakota and Kamala Residential Districts: The total length of the water-supply system in Sub-site 2, including the buildings’ water pipeline branches, is 15 164 m.
Sub-site 3. Rehabilitation of Patoka Nava (Kamala) pumping station.
Sub-site 4. Rehabilitation of SEI gully.
Sub-site 5. Rehabilitation of the sewerage in the Central Part of the town: Main sewer I, left; Main sewer II, right.
The total length of the sewerage network subject to rehabilitation and extension is 5805 m, of which 700 m are executed using no-excavation technology. Newly built street inspection pits: 157.