Water-supplies and sewerage systems

Golf center Ravno Pole

Golf center Ravno Pole

Golf center Ravno Pole - Water supply with drinking and hot mineral water
Stabilization of landslide section Iztok, town of Oryahovo

Stabilization of landslide section Iztok, town of Oryahovo

Drainage shaft, construction of drainage system of bored wells, lead away profiles from the bored wells to the street sewerage system.
Rehabilitation of main water supply system Varna-Giolden Sands

Rehabilitation of main water supply system Varna-Giolden Sands

Rehabilitation of main water supply system Varna-Golden Sands and laying of new  conduit of glass reinforced plastic (GRP) pipes  DN 800 with 2200m length and HDPE pipes DN800 with 1100 m length.
Additional emergency water supply of Momina Klisura Village

Additional emergency water supply of Momina Klisura Village

Sub-sites: Pressure tank - 500 cubic meters Fast sand filter - 30 cubic meters per hour Sedimantation chamber of three csections, chlorinating and reagen. Supply pipeline DN 140 high-density polyethylene.
Reconstruction and modernisation of Potable Water Treatment Plant Yagoda to the Town of Stara Zagora

Reconstruction and modernisation of Potable Water Treatment Plant Yagoda to the Town of Stara Zagora

The water main section subject to reconstruction was performed by using glass-fiber reinforced plastic pipes and fitting of DN 1000/PN 0,6Mpa/ SN 2500, produced by SUBOR, Turkey. The total length of the water line approximately 1300m.
Water supply of Vodenci village, Water supply of Gledka village

Water supply of Vodenci village, Water supply of Gledka village

Water -main is made of high density polyethilene (HDPE) pressure pipes. Pressure water tanks of V=150 m³ and pump station are built.