Home / Projects / Hydrotechnical construction / Strengthening of the river, sea banks and landslides

Strengthening of the river, sea banks and landslides

Stabilisation of the fifth inclined quay wall of the town of Vidin - centre port terminal

Stabilisation of the fifth inclined quay wall of the town of Vidin - centre port terminal

Contracting Authority: PORT INFRASTRUCTURE STATE ENTERPRISE. Contractor: STANILOV LTD.
Fortification of the banks of the river Arda in the town of Kardzhali

Fortification of the banks of the river Arda in the town of Kardzhali

A corrected section of the river is built in the area of the city. The banks are consolidated with supporting walls high 4,90 - 6,50 m. The construction is in the conditions of large water inflow, due to the work of the Water Power Plant Kadzhali. Contemporaneously with this project the adjacent equipments of the infrastructure of the city - sewerage collectors, electric power lines HV etc. are refurbished. The project includes performance of a barrage with 9 section gates, each one with width ...
To whom it concern

To whom it concern

Ladies and Gentlemen, Stanilov Ltd is a private construction organization, established in 1995. The company is specialized and works mainly in hydro-technical and hydro-power engineering. Some of the biggest infrastructural projects, financed by the pre-program of the European Union (Phare and ISPA programs) European and World Bank are executed by Stanilov Ltd. The Company position, regarding the latest problem named “Water Mirror” could be only
Stabilization of landslide section "Iztok", town of Oryahovo

Stabilization of landslide section "Iztok", town of Oryahovo

Drainage shaft, construction of drainage system of bored wells, lead away profiles from the bored wells to the street sewerage system
Bank reinforcement facility dyke Albena - Balchik

Bank reinforcement facility dyke Albena - Balchik

The project is under ISPA program. Stone embankment dyke L=2394,00m: Construction made up of core of blasted rock mass and slope protection with large rock pieces weighing 100-1500 kg. The dyke's crown shall be executed via application of concrete pavement - width 6m and thickness 0,2m over penetrating concrete base layer with thickness 0,10m. Additional ancillary facilities in view of attaining adequate consolidation efficiency: Drainage ribs at distance of 50-80m between the slope and ...
Danube Riverbank Protection Scheme, Zone III, Cherkovitza - Zagrajden, km. 600 000 - km. 631 500 - Lot 3

Danube Riverbank Protection Scheme, Zone III, Cherkovitza - Zagrajden, km. 600 000 - km. 631 500 - Lot 3

The project is funded under ISPA program and is part of the schemes for strengthening of the Danube river and comprises the projects in zone III - Cherkovitza, Somovit, Kalnovetz, Zagrajden East and Zagrajden West ( from km 600,000 to km 631,500 on the river mileage). Project's target is to cease the negative processes leading to Danube's right bank subvertion. In each of the five Sections, the type of the construction works and and the conditions for execution are similar to each other. The ...
Landslide stabilization in Sveti Nicola area - Varna

Landslide stabilization in Sveti Nicola area - Varna

The project is funded under ISPA program and includes: Implementation of four drainage shafts 15 meters in depth, with a diameter 6.10 meters, stabilized with steel rings, steel sheets "Bernold" and concrete with a thickness of 30 cm. Horizontal bored drains of 140 meters length and drainage perforated galvanized pipes DN 89 with a total length of 3640m. Rehabilitation of main water supply system Varna - Golden Sands and laying of new conduit of glass reinforced plastic (GPR) pipes DN ...