Subway tunnels and stations
Underground pedestrian walkway connection between MS „Tsarigradsko shose“ and „Obikolna“ Street in Residential Quarter „Druzhba“
2014 - 2015, Subway tunnels and stations
• Assignor: „METROPOLITAN“ EAD
• Contractor: Consortium „UNDRGROUND CONSTRUCTION PARTNERS 2014"–
Consortium members:
-„STANILOV” LTD – Leading Partner with 67 % participation.
-„VIA CONSTRUCT GROUP” LTD – Partner with 30 % participation.
-„SVEKO ENERGOPROEKT” AD – Partner with 3 % participation.
Extension of Sofia Metro, II-nd metrodiameter, Section from МS "James Bouchier" -МSII-11 up to МSII-12
2014 - 2016, Subway tunnels and stations
Subway line II, section (from the subway station MS II-11, km 10+452) to the subway station MS II-12 with a line point after it (km 11+752) and a part of a transport ramp.
The total length of the subway section is 1300.3 m. The tunnel section of 781 m of length from the subway station MS II-11 to the inter-station Ventilation System II 11-12 is to be constructed using NATM (New Austrian Tunnel Method). The remaining part of the route is
MS 21- GARA ISKAR SUBWAY STATION – DIAPHRAGM WALLS
2013 - 2014, Subway tunnels and stations
Site: Sofia Subway Extension Project: stage II – diameter I, Tsarigradsko Shose Blvd. (MS 19) – Druzhba Residential District – Sofia Airport (MS 23) Section:
Extension of Sofia metro,I-st metrodiameter,Stage III,Lot2, Section from MS13-Mladost1 up to MS16-Business Park- Mladost4
2013 - 2015, Subway tunnels and stations
Lot No. 1: Section from Subway Station MS 13 (Mladost 1, km 15+450) to km 17+000;
Metro-station 20 – Project for expand of the Sofia metro, stage III, Lot 1, section from Tsarigradsko shosse
2012 - 2015, Subway tunnels and stations
The section executed by joint-venture „Stanilov-Metroproject“ begins straight from the „Tsarigradsko shosse“ Blvd., crossing a plain part , then overcome partly with the open structure the strait slope, in plain part crossing „Prof. Tsvetan Lazarov“ Blvd and reaches the area of Metro station 20. The main part of the Lot is underground with 1046 m length and includes one underground metro station – Metro station 20.
Construction of Metro Station 4 - Part of Sofia's II metro diameter. Assignor: Metropoliten EAD
2009 - 2012, Subway tunnels and stations
Site encompasses execution of metro tunnel and Metro station II - 4 at the section km 3+434 - km 3+584.
Metrostation II-4 is of the "platform" type with two vestibules and total length of 150,25 m
Metro station 7 - Sofia
2007 - 2008, Subway tunnels and stations
Construction of a rotational shaft with sizes 29/25 m and depth 25 m. The construction is in complex engineering-geological conditions. A modern type of fortification with pilots, anchors, sprayed concrete and reinforced concrete lining is applied.
Metro station 12 – Sofia
2006 - 2008, Subway tunnels and stations
The metro station is located on “Andrey Saharov” boulevard just before the “Vartopolo” bridge on the border between residential areas “Mladost” and “Darvenica”. The station is on two levels – over ground on which the rail trace is situated and underground level with office premises and entrance hall the access to which is accomplished by two subways. The upper ground platforms are covered by steel construction, edged with etalbond ...