Home / Projects / Roads, road tunnels and bridges / Subway tunnels and stations / MS 21- GARA ISKAR SUBWAY STATION – DIAPHRAGM WALLS

MS 21- GARA ISKAR SUBWAY STATION – DIAPHRAGM WALLS

Site: Sofia Subway Extension Project: stage II – diameter I, Tsarigradsko Shose Blvd. (MS 19) – Druzhba Residential District – Sofia Airport (MS 23) Section:

2013 - 2014

Site: Sofia Subway Extension Project: stage II – diameter I, Tsarigradsko Shose Blvd. (MS 19) – Druzhba Residential District – Sofia Airport (MS 23) Section:
Lot No. 2: Section from km 3+184.90 (end of MS 20) to Poruchik Nedelcho Bonchev Street, km 5+010.00.
Scope of STANILOV LTD. works:
Construction and installation works – execution of diaphragm walls and performance of all types of Construction and Installation Works (CIW) for the strengthening of MS 21 (from km 4+339.21 to km 4+359.21) and 8 poured piles with a diameter of 600 and a length of 20 m.