Metro station 7 - Sofia

2007 - 2008

Construction of a rotational shaft with sizes 29/25 m and depth 25 m. The construction is in complex engineering-geological conditions. A modern type of fortification with pilots, anchors, sprayed concrete and reinforced concrete lining is applied.