Home / Projects / Road construction

Road construction

Sofia Airport - bridge over the Iskar river

Sofia Airport - bridge over the Iskar river

2004 - 2004, Road construction
Sofia Airport - bridge over the Iskar river - dewatering and construction of foundations.
Urgency repairs and consolidation of breached slope of Hemus motor-way from km 30+980 to km 31+140, left

Urgency repairs and consolidation of breached slope of Hemus motor-way from km 30+980 to km 31+140, left

2003 - 2003, Road construction
Aplication of renforcement, extruded geo-net TENAX TT045 - 8450 m²; Geo-mat application - 1166 m²; Fabrication and delivery of steel gabions - 21 315 kg (47 nos.). Welded mesh Ф8/15 for sharping face - 10 130 kg. Delivery and laying of drainage HDPE Ф200mm - 120; Geo-net filter application - 863 m²; Broken stone application - 260 m³; Crushed stone application - 200 m³; Geo-net filter application - 120 m³; Steel A-III N20 for drainage ...
Dam Jadenitsa, site Jadenitsa, Road on the left bank of river Jadenitsa and water supply

Dam Jadenitsa, site Jadenitsa, Road on the left bank of river Jadenitsa and water supply

2001 - 2002, Road construction
The building sub-sites appear to be a part of temporary and complementary construction for building the Yadenitsa Dam. The construction has been accomplished under severe high-mountain conditions. The road is 8600 m long, asphalt concrete with elastic fence. Steel pipeline and chloration station for water-supply of the construction area.
Yadenitsa Dam, Yadenitsa Site, Construction sites and connecting road to the dam wall, portal for tunnel

Yadenitsa Dam, Yadenitsa Site, Construction sites and connecting road to the dam wall, portal for tunnel

1999 - 2001, Road construction
Yadenitsa Dam is to be built in order to enhance the volume of the lower equalizer of Hydroelectric power plant Chaira. The comstruction area is situated in the Northern part of Belmeken branch of Rila mountain massif at elevation higher than 1200 m. Construction and fitting works of the building sub-sites appear to be a part of temporary and complementary construction for building the dam. The following works were carried out, during realization of all facilities: deep ancars and excavation, ...
Reinforsment of Damaged Sections of the Operating Road to Beli Iskar Dam

Reinforsment of Damaged Sections of the Operating Road to Beli Iskar Dam

1996 - 1997, Road construction
Reconstruction is carried out according to the "Technology of performing greinforced embankment construction" which consists in fitting of rocky material. The reinforcing geo-net has been produced by using of monoaxially oriented polymer HDPE (high-density polyethylene) and is designed especially for reinforsment of grounds.